How to Build a Garage

Then it was the frame, foam, plastic, rebar , & tubing (08/19/2007) Cement work. Good job guys! (08/25/2007)

Next: the cement blocks around the perimeter, & then the framing (09/13/2008)
Take time to feed the hardworking crew! (09/13/2008)

Back to work w/ the trusses (the weather didn't cooperate & got a little drizzle) (09/13/2008)

Roof on w/ tar paper, and the outside walls being put on. (09/21/2008)
Weatherproof: house wrap, metal roof, sofeting & fascia board (Brown garage doors from the Overhead Door Co. ) (02/10/2009)
It took 2 summers and major budgeting to complete. This summer will be siding.