Monday, March 30, 2009

How We Remodeled Bedroom#1

In the first picture to the left was the bedroom before. Spackled ceiling, blue walls with "clouds" & glow-in-the dark painted stars, and tan carpeting. (11/14/2007)

We chiseled off the ceiling & painted that and the closet white. We then pulled out the carpet. The walls were primed, taped, & painted. (04/12/2008)


David insulated & replaced the window frame. He used a beautiful wood that he worked hard at sanding, priming, & painting to smooth it out. See left.

Summer was spent on the garden & garage, so the bedroom stayed dormant until winter again. (02/14/2009)
Wainscoting was put on the walls and chair & crown molding that Dave & his Dad created was painted & put up. 03/07/2009


The doors were sanded, primed, & painted. We found that hanging a door is easier said than done
!

The outside of the door was polyurethaned as well as the molding. (Pretty, huh?)

Medium Grey carpeting was installed on 03/28/2009

We already have a matching full bed, dresser, and desk that will be going into the room once they are touched up a bit. They are Christi's old bedroom set that need a little TLC, but we hope this room is warm and welcoming for our future guests!

1 comment: